Emergency line, same number
Line strike, main break, or permit window closing — dispatch answers 24/7 when locates and safe access allow.
Oklahoma statewide
Microtunneling and TBM methods mine soil at the face while pipe is jacked behind a steering head — built for gravity sewer, large outfalls, and owner specs where HDD diameter or tolerance is insufficient.
Microtunneling and TBM methods mine soil at the face while pipe is jacked behind a steering head — built for gravity sewer, large outfalls, and owner specs where HDD diameter or tolerance is insufficient.
Entry and reception shafts are shored and dewatered. A microtunnel machine advances on laser guidance; slurry or spoil handling matches groundwater. Pipe segments follow the mined face per municipal detail.
RCP, steel jacking pipe, and concrete segments — commonly 24 inches through 120+ inches on major work.
Mid-size to large municipal programs — not typical for residential laterals.
Deep urban trunk lines would require enormous trenches and utility conflicts. Shaft footprints localize disruption.
Shaft and tunnel alignments need exhaustive locate, monitoring, and often traffic and environmental permits beyond a standard 811 ticket.
Diameter, length, shaft depth, groundwater handling, disposal, guidance, and municipal inspection milestones.
Get a Free Estimate →Shrink-swell clay, OG&E congestion, and ROW permits change the math — we scope before we mobilize.
Line strike, main break, or permit window closing — dispatch answers 24/7 when locates and safe access allow.
Send path, diameter, and county — we explain footage, rock, traffic control, and tap fees as drivers, not a menu price.
Oklahoma dig law, pothole conflicts, and expired tickets stop work — we document locates for commercial and municipal files.
Finished berms, brick walks, and tenant parking stay largely intact when HDD or casing fits the alignment.
Different tools: face mining and pipe jacking versus surface drill string. Spec and diameter pick the method.
We coordinate with your engineer for shaft, mining, and reception hold points defined in the contract.
Short commercial or residential work rarely justifies shaft spreads — we route those to HDD or auger bore.
HDD uses a steerable drill head to create an underground path, then pulls pipe or conduit through without a continuous surface trench. It is the standard way to cross driveways, parking lots, highways, and waterways when restoration costs matter.
Quotes depend on footage, pipe size, red clay or rock, groundwater, traffic control, and how many utilities share the corridor — we do not publish a per-foot rate. Send your alignment and we will break down the cost drivers on a free estimate.
24/7 — Emergency dispatch statewide — (512) 838-3643
Scope your bore path
Step 1 of 2 — path, pipe, and city first