Auger boring (jack and bore) pushes steel casing in a straight line from a drive pit to a reception pit while spoil is removed mechanically. Carriers are grouted inside the casing on many railroad and highway templates.

Call (512) 838-3643

Horizontal auger boring machine installing steel casing in sheet pile shored pit beneath Oklahoma highway

What Is Auger Boring / Jack & Bore?

Auger boring (jack and bore) pushes steel casing in a straight line from a drive pit to a reception pit while spoil is removed mechanically. Carriers are grouted inside the casing on many railroad and highway templates.

How It Works

Shored pits are set on line and grade. Casing segments jack forward with a rotating cutting head. After the pipe is seated, product pipe or ducts are installed per agency spec.

Who Needs Auger Boring / Jack & Bore?

  • Railroad crossings where BNSF or UP templates require casing
  • Storm or sanitary installs under levees and channel banks
  • Straight drives under building footprints with rigid carrier protection

Materials & Pipe Sizes

Steel casing 12 inch through 72 inch and larger; internal HDPE, DIP, PVC, or multi-duct as designed.

Project Scale

Forty-foot neighborhood drives to five-hundred-foot agency crossings with intermediate jacking when engineered.

Benefits vs Open-Cut Trenching

Jack and bore keeps pavement width intact on short, straight obstacles. Curved alignments or long HDPE pulls without casing usually shift scope to HDD.

  • Agency-familiar casing installs
  • Predictable grade on straight pushes
  • Protects carrier in unstable fill
  • Works where fluid drilling is restricted

When You Need This Service

  • Engineer specifies steel casing
  • Railroad agreement names jack and bore
  • Straight shot under levee or approach slab
  • Limited footprint for drive pit only

811 & Permits

Pit excavation exposes adjacent utilities — locates, shoring, and dewatering follow Oklahoma ROW rules and city shoring standards.

Cost Factors (No Flat Rate)

Casing size, drive length, pit depth, groundwater, rail or highway flagging, and welding inspection.

Get a Free Estimate →
Why specs list trenchless here

Oklahoma ground rewards planning before the rig arrives

Shrink-swell clay, OG&E congestion, and ROW permits change the math — we scope before we mobilize.

Emergency line, same number

Line strike, main break, or permit window closing — dispatch answers 24/7 when locates and safe access allow.

Alignment review at no charge

Send path, diameter, and county — we explain footage, rock, traffic control, and tap fees as drivers, not a menu price.

One-Call before every pit

Oklahoma dig law, pothole conflicts, and expired tickets stop work — we document locates for commercial and municipal files.

Pits, not trenches

Finished berms, brick walks, and tenant parking stay largely intact when HDD or casing fits the alignment.

FAQ

Auger Boring / Jack & Bore FAQ

Jack and bore or HDD in Oklahoma?

Casing templates and straight alignments favor auger bore. Curved paths or long HDPE without casing favor HDD. We align with your engineer before quoting.

Railroad lead times?

Often longer than the physical bore. Start BNSF or UP coordination early — we scope flagging and inspection holds in the quote.

Problem soils for jacking?

Running sand and cobbles without dewatering can stall progress. Test pits and geotech reduce guesswork.

What is horizontal directional drilling (HDD)?

HDD uses a steerable drill head to create an underground path, then pulls pipe or conduit through without a continuous surface trench. It is the standard way to cross driveways, parking lots, highways, and waterways when restoration costs matter.

How much does directional boring cost in Oklahoma?

Quotes depend on footage, pipe size, red clay or rock, groundwater, traffic control, and how many utilities share the corridor — we do not publish a per-foot rate. Send your alignment and we will break down the cost drivers on a free estimate.

Free Auger Boring / Jack & Bore Quote

24/7 — Emergency dispatch statewide — (512) 838-3643

Scope your bore path

Send alignment details

Step 1 of 2 — path, pipe, and city first

Free alignment reviewOklahoma One-Call disciplineLicensed spreads statewide24/7 emergency line